Directions to Mine |
I87S to 90 East to exit 10 to Route 20 to route 8 Otis Rd, to left onto Route 44 to right onto Rte 167 Avon Road. Travel 3.4 miles to Harris Rd go 1.5 miles on Harris Rd onto Brickyard road mine on left. (105 Brickyard Rd, Farmington, CT)
|
Parties
Name
|
Dunning Sand & Gravel Company Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
2022-01-26
|
|
Name
|
Dunning Industries Inc
|
Role
|
Operator
|
Start Date
|
2022-01-27
|
|
Name
|
Benjamin W Dunning
|
Role
|
Current Controller
|
Start Date
|
2022-01-27
|
|
Name
|
Dunning Industries Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2014-11-18
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Employee was washing out sand screw and foot slipped on catwalk and pulled muscle in left leg.
|
|
Accident Date |
2010-08-16
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck by flying object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The employee was bolting a bracket with an impact gun on a water truck. The air from the exhaust of the impact gun disrupted some metal shavings that entered the employee's right eye. The employee was wearing eye protection at the time of the incident. The eye was flushed several times with water and he thought that it was ok.
|
|
Accident Date |
2009-06-19
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by falling object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee was unwinding a spool of 1 steel hoist cable with a co-worker's assistance. The cable slipped off of the side of the spool and came in contact with employee's foot just behind the steel toe portion of the boot. Foot swelled slightly and was bruised.
|
|
Accident Date |
2005-10-25
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Employee was descending a catwalk on the plant. The ramp was wet due to rain. The employee slipped on the catwalk and twisted his ankle while trying to regain his footing. He was taken to the Uconn Medical Center for x-rays and treatment. It was determined that he has a sprained ankle and is to ice it and stay off it for a few days.
|
|
Inspections
Start Date |
2024-04-02
|
End Date |
2024-04-02
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2024-03-27
|
End Date |
2024-03-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25
|
|
Start Date |
2023-03-13
|
End Date |
2023-03-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2021-10-19
|
End Date |
2021-10-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2021-08-25
|
End Date |
2021-08-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2020-07-20
|
End Date |
2020-07-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.75
|
|
Start Date |
2019-02-05
|
End Date |
2019-02-08
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2018-11-08
|
End Date |
2018-11-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2018-10-30
|
End Date |
2018-11-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2018-09-12
|
End Date |
2018-09-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22
|
|
Start Date |
2018-03-06
|
End Date |
2018-03-12
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2017-08-01
|
End Date |
2017-08-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.25
|
|
Start Date |
2016-12-21
|
End Date |
2016-12-27
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
2
|
Total Hours |
14
|
|
Start Date |
2015-12-01
|
End Date |
2015-12-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2015-10-19
|
End Date |
2015-10-19
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2015-06-04
|
End Date |
2015-06-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2015-05-20
|
End Date |
2015-05-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.75
|
|
Start Date |
2014-08-21
|
End Date |
2014-08-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.75
|
|
Start Date |
2013-06-13
|
End Date |
2013-06-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2011-12-20
|
End Date |
2011-12-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
11930
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1988
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2007
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2007
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
10641
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2128
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2316
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2316
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
7606
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1521
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
1926
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1926
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
10140
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2028
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
2415
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2415
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
8588
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2147
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2403
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2403
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
11641
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2328
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
2232
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2232
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
4243
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2122
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
2201
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2201
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
4691
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2346
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2400
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2400
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
6012
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1503
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
1440
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1440
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
6303
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1576
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
2596
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1298
|
|
|
Directions to Mine |
Exit 93 off I95 to 184E. Left onto Boombridge Road. Entrance on 4S just past anthony Drive.
|
Parties
Name
|
Dunning Sand & Gravel Inc
|
Role
|
Operator
|
Start Date
|
2011-02-15
|
End Date
|
2021-09-13
|
|
Name
|
Dunning Industries Inc
|
Role
|
Operator
|
Start Date
|
2021-09-14
|
|
Name
|
Benjamin W Dunning
|
Role
|
Current Controller
|
Start Date
|
2021-09-14
|
|
Name
|
Dunning Industries Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2014-05-20
|
End Date |
2014-05-21
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2013-05-14
|
End Date |
2013-05-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2013-05-13
|
End Date |
2013-05-15
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2012-01-30
|
End Date |
2012-02-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2011-02-14
|
End Date |
2011-02-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
29
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
520
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
520
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
680
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
680
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
1325
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1325
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
839
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
839
|
|
|