Entity Name: | G&G CONCRETE CORP. |
Jurisdiction: | Connecticut |
Legal type: | Stock |
Citizenship: | Domestic |
Status: | Active |
Sub status: | Annual report due |
Date Formed: | 26 Jan 2004 |
Business ALEI: | 0772282 |
Annual report due: | 26 Jan 2026 |
Business address: | 31 HAVEN STREET, NEW HAVEN, CT, 06513, United States |
Mailing address: | 31 HAVEN ST, NEW HAVEN, CT, United States, 06513 |
ZIP code: | 06513 |
County: | New Haven |
Place of Formation: | CONNECTICUT |
Total authorized shares: | 100 |
E-Mail: | jmguaillas@ggconcretecorp.com |
NAICS
238990 All Other Specialty Trade ContractorsThis industry comprises establishments primarily engaged in specialized trades (except foundation, structure, and building exterior contractors; building equipment contractors; building finishing contractors; and site preparation contractors). The specialty trade work performed includes new work, additions, alterations, maintenance, and repairs. Learn more at the U.S. Census Bureau
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
G&G CONCRETE RETIREMENT SAVINGS PLAN | 2023 | 522437631 | 2024-04-09 | G&G CONCRETE | 31 | |||||||||||||
|
||||||||||||||||||
G&G CONCRETE RETIREMENT SAVINGS PLAN | 2022 | 522437631 | 2023-06-28 | G&G CONCRETE | 30 | |||||||||||||
|
||||||||||||||||||
G&G CONCRETE RETIREMENT SAVINGS PLAN | 2021 | 522437631 | 2022-09-13 | G&G CONCRETE | 36 | |||||||||||||
|
||||||||||||||||||
G&G CONCRETE RETIREMENT SAVINGS PLAN | 2020 | 522437631 | 2021-05-11 | G&G CONCRETE | 23 | |||||||||||||
|
Name | Role | Business address | Mailing address | Phone | Residence address | |
---|---|---|---|---|---|---|
JOSE M. GUAILLAS | Agent | 31 HAVEN STREET, NEW HAVEN, CT, 06513, United States | 31 HAVEN STREET, NEW HAVEN, CT, 06513, United States | +1 203-648-7046 | jmguaillas@ggconcretecorp.com | 31 HAVEN ST., NEW HAVEN, CT, 06513, United States |
Name | Role | Business address | Phone | Residence address | |
---|---|---|---|---|---|
JOSE M. GUAILLAS | Officer | 31 HAVEN STREET, NEW HAVEN, CT, 06513, United States | +1 203-648-7046 | jmguaillas@ggconcretecorp.com | 31 HAVEN ST., NEW HAVEN, CT, 06513, United States |
Type | Old value | New value | Date of change |
---|---|---|---|
Name change | GUIDO GONZALEZ CONCRETE CORPORATION | G&G CONCRETE CORP. | 2007-07-12 |
Filing number | Filing date | Effective date | Filing category | Filing type | Report year |
---|---|---|---|---|---|
BF-0012964075 | 2025-01-13 | - | Annual Report | Annual Report | - |
BF-0012318402 | 2024-01-19 | - | Annual Report | Annual Report | - |
BF-0011279863 | 2022-12-27 | - | Annual Report | Annual Report | - |
BF-0010174570 | 2021-12-27 | - | Annual Report | Annual Report | 2022 |
BF-0009805364 | 2021-07-26 | - | Annual Report | Annual Report | - |
0006744161 | 2020-02-06 | - | Annual Report | Annual Report | 2020 |
0006721120 | 2020-01-13 | - | Annual Report | Annual Report | 2019 |
0006158725 | 2018-04-11 | - | Annual Report | Annual Report | 2018 |
0005740591 | 2017-01-16 | - | Annual Report | Annual Report | 2017 |
0005505369 | 2016-03-07 | - | Annual Report | Annual Report | 2016 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
334930781 | 0111500 | 2012-06-26 | 200 LUDLOW STREET, STAMFORD, CT, 06907 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 490098 |
Safety | Yes |
Type | Inspection |
Activity Nr | 494119 |
Safety | Yes |
Type | Inspection |
Activity Nr | 493279 |
Safety | Yes |
Type | Inspection |
Activity Nr | 492018 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2012-09-12 |
Current Penalty | 1600.0 |
Initial Penalty | 2800.0 |
Final Order | 2012-09-28 |
Nr Instances | 6 |
Nr Exposed | 7 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. Jobsite: The employees, finishing concrete, were not protected from fall hazards by the use guardrails, safety nets or personal fall arrest systems. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19260502 D01 |
Issuance Date | 2012-09-12 |
Current Penalty | 1100.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-28 |
Nr Instances | 6 |
Nr Exposed | 6 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(1): Personal fall arrest system connectors were not drop forged, pressed or formed steel, or made of equivalent materials: Jobsite: The carabiners without eye that the employee used as part of a personal fall arrest system was made of aluminum and not dropped forged. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19260502 D03 |
Issuance Date | 2012-09-12 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-09-28 |
Nr Instances | 6 |
Nr Exposed | 6 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(3): Snap hooks, used as part of a personel fall protection system, did not have a minimum tensil strength of 5000 pounds Jobsite: The carabiners without eye that the employee used as part of a personal fall arrest system was not rated with a minimum tensile strength of 5000 pounds. |
Citation ID | 01002C |
Citaton Type | Serious |
Standard Cited | 19260502 D06 V |
Issuance Date | 2012-09-12 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-09-28 |
Nr Instances | 6 |
Nr Exposed | 6 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(6)(v): A snaphook not of the locking type was engaged (i) directly to webbing, rope or wire rope; (ii) to each other (iii) to a Dee-ring to which another snaphook or other connector is attached;(iv) to a horizontal lifeline; or (v) to any objectwhich is incompatibly shaped or dimensioned in relation to the snaphook such that unintentional disengagement could occur by the connected object being able to depress the snaphook keeper and release itself. Jobsite: The non-locking carabiners without eye that the employee used as part of a personal fall arrest system was engaged directly to the rope that was use as the lifeline. |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19260502 D09 |
Issuance Date | 2012-09-12 |
Current Penalty | 1100.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-28 |
Nr Instances | 6 |
Nr Exposed | 6 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(9): Lanyards and/or vertical lifelines did not have a minimum breaking strength of 5,000 pounds (22.2 kN): Jobsite: The lifelines that were used by employees as a part of a fall protection system did not have a minimum breaking strength of 5000 pounds. |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19260502 D11 |
Issuance Date | 2012-09-12 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-09-28 |
Nr Instances | 5 |
Nr Exposed | 5 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(11): Lifelines were not protected against being cut or abraded: Jobsite: The lifelines that were used by employees as a part of a fall protection system were not protected from cuts or abrasions. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260502 D15 |
Issuance Date | 2012-09-12 |
Current Penalty | 1100.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-28 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(d)(15): Anchorage points used for attachment of personal fall arrest equipment were not independent of any anchorage point being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee. Jobsite: The single anchorage point that was used to attach the employees personal fall arrest system was not rated to support at least 5000 pounds per employee. |
Citation ID | 01005 |
Citaton Type | Serious |
Standard Cited | 19260503 A01 |
Issuance Date | 2012-09-12 |
Abatement Due Date | 2012-09-19 |
Current Penalty | 1100.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-28 |
Nr Instances | 5 |
Nr Exposed | 5 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: Jobsite: The employees who was exposed fall hazards of up to 51 feet above the ground while working on balconies was not trained in fall hazards and the procedures to be followed to minimize such hazards. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
5602278404 | 2021-02-09 | 0156 | PPS | 31 Haven St, New Haven, CT, 06513-3844 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
This table presents a concise summary of a company's liens and debts, detailing essential information such as the lien type, debt amount, associated parties, and current status of each financial obligation.
Subsequent Filing No | Status | Type | Filing Date | Lapse Date | Filing Type | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
0005175567 | Active | OFS | 2023-11-09 | 2028-11-09 | ORIG FIN STMT | |||||||||||||
|
Name | G&G CONCRETE CORP. |
Role | Debtor |
Name | Wells Fargo Bank, N.A. |
Role | Secured Party |
Parties
Name | G&G CONCRETE CORP. |
Role | Debtor |
Name | TD BANK, N.A. |
Role | Secured Party |
Parties
Name | G&G CONCRETE CORP. |
Role | Debtor |
Name | READYCAP LENDING, LLC |
Role | Secured Party |
Parties
Name | TD BANK, N.A. |
Role | Secured Party |
Name | G&G CONCRETE CORP. |
Role | Debtor |
Sources: Company Profile on Connecticut's Official State Website
* While we strive to keep this information correct and up-to-date, it is not the primary source, and the dataset source should always be referred to for definitive information